dam up中文翻译_dam up读音_dam up用法 - 英语词典 dam up中文翻译_dam up读音_dam up用法 - 英语词典
词语吧>英语词典>dam up翻译和用法

dam up

英 [dæm ʌp]

美 [dæm ʌp]

壅高;筑坝壅水;挡水

英英释义

verb

  • obstruct with, or as if with, a dam
    1. dam the gorges of the Yangtse River
    Synonym:dam

双语例句

  • Thirdly, the framework of early-warning system for ill reservoir dam is set up with the Web GIS technology. Based on the above, the classification and the selection and the principle of the early warning index is studied, including the developing method for the index system.
    构建了基于WebGIS的病险水库大坝预警系统架构,在此基础上,研究了预警指标的分类、预警指标筛选的条件和原则以及指标体系的构建方法。
  • Dam foundation and dam construction quality come up to excellent standards and the project is elected the high-quality project.
    大坝工程的基础处理及填筑施工质量达到优良水平,被水电部评为优质工程。
  • The forecast model of dam deformation is set up on the basis of the time alignment decomposition method.
    基于时间序列分解法建立大坝变形预测模型。
  • The impermeability of the concrete has been greatly improved and leakage of the dam body is decreased up to 1. 88 m3/ h, thus meeting the design requirement.
    堰顶横缝表面封堵和混凝土裂缝的化学灌浆处理,增强了混凝土的防渗性能,坝体渗漏量降为1.88m3/h,满足了设计要求。
  • This dam backs up the water to prevent floods.
    这个坝可以拦住水,以防泛滥。
  • Jack is not such a man as can dam up his feeling.
    杰克不是能控制感情的人。
  • Therefore, protective measures for preventing tailing dam breach should be taken from the respects of improving the design of flood control ability, strengthening the stability of the dam and tightening up the management.
    因此,预防溃坝的环境风险防护措施,要从防洪设计、增强坝体稳定性及加强管理等方面进行。
  • Stress variation law about masonry multi-arch dam is brought up a and the final stabilization layout to Pingqiao masonry multi-arch dam is decided.
    分析各加固方案对砌石连拱坝应力影响的基本规律,并确定适合本工程项目的加固方案;
  • A combined measure of paving compound film on the upstream surface of dam and setting up vertical anti-seepage in dam foundation is adopted to treat leakage.
    因此一般采用上游坝面铺设复合土工膜和坝基垂直防渗措施进行防渗漏处理。
  • The problem of uplift pressure being higher in non-overflow sections at the right bank of Shiquan dam has come up since the first dam safety inspection, a lot of studies and work have been done but got lower effect.
    石泉大坝右岸非溢流坝段扬压力超标问题自第一次安全定期检查提出后,曾做过大量的加固研究工作,但效果一直不明显。